{"release":{"id":"2d86bd12ba77a288053b34ea2517324b92d03c8039b7f5d156fa4002421384a1","published":"2026-11-10T16:06:46Z","pinned":false},"limits":{"coverage":{"history":"from:2022-11-29","held_since":"2022-11-29","gaps":[],"covered":["153/2013 — RTS — Requirements for central counterparties [in force] L2"],"not_covered":["national guidance","court decisions"]},"freshness":{"release_id":"2d86bd12ba77a288053b34ea2517324b92d03c8039b7f5d156fa4002421384a1","release_published":"2026-11-10T16:06:46Z","checked_at":"2026-11-09","checked_against":"EUR-Lex"},"truncation":null,"failures":[],"incomplete":[]},"page":{"path":"/emir/level-2/rts/153-2013-requirements-for-central-counterparties/articles/2","url":"https://www.headlesslaw.com/emir/level-2/rts/153-2013-requirements-for-central-counterparties/articles/2","title":"Article 2 — Information to be provided to ESMA for the recognition of a CCP","family":"l2_unit_view","work_id":"spaces/emir/level-2/rts/153-2013-requirements-for-central-counterparties","view_of":"/emir/level-2/rts/153-2013-requirements-for-central-counterparties","status":"in_force","force_status":"in_force","date_state":"current","requested_date":null,"as_of":"2026-11-11","applies_from":null,"application":null,"version_label":"Consolidated version of 7 March 2024","check":{"against":"EUR-Lex","on":"2026-11-09"},"check_result":"matched","official_url":"https://eur-lex.europa.eu/legal-content/EN/TXT/?uri=CELEX:02013R0153-20240307","valid_from":"2013-03-15","valid_until":null,"revision":1,"content_id":"81959785c5733d7a","versions":["2013-03-15"],"version_url":"https://www.headlesslaw.com/emir/level-2/rts/153-2013-requirements-for-central-counterparties/articles/2/versions/2022-11-29","revision_url":"https://www.headlesslaw.com/emir/level-2/rts/153-2013-requirements-for-central-counterparties/articles/2/versions/2022-11-29/rev/81959785c5733d7a","versions_url":"https://www.headlesslaw.com/emir/level-2/rts/153-2013-requirements-for-central-counterparties/articles/2/versions","relations_url":"https://www.headlesslaw.com/emir/level-2/rts/153-2013-requirements-for-central-counterparties/articles/2/relations","act_url":"https://www.headlesslaw.com/emir/level-2/rts/153-2013-requirements-for-central-counterparties#art-2","source_line":"Commission Delegated Regulation (EU) No 153/2013 · binding · OJ L 52, 23.2.2013 · dated 19 Dec 2012 [in force]","attribution":{"prepared_by":"European Commission","published_by":"Publications Office of the EU","published_in":"Official Journal of the European Union","document_type":"delegated_regulation","legal_nature":"binding_adopted","addressees":"not stated in the document","dates":{"document_date":"2012-12-19","entry_into_force":"2013-03-15","locators":{"document_date":"CELLAR 32013R0153 work_date_document","entry_into_force":"CELLAR 32013R0153 resource_legal_date_entry-into-force (earliest on or after the document date)"}},"adoption":null},"context":{"act":{"work_id":"spaces/emir/level-2/rts/153-2013-requirements-for-central-counterparties","path":"/emir/level-2/rts/153-2013-requirements-for-central-counterparties","name":"Commission Delegated Regulation (EU) No 153/2013","number":"153/2013","celex":"32013R0153","title_official":"COMMISSION DELEGATED REGULATION (EU) No 153/2013 of 19 December 2012 supplementing Regulation (EU) No 648/2012 of the European Parliament and of the Council with regard to regulatory technical standards on requirements for central counterparties (Text with EEA relevance)","document_date":"2012-12-19"},"position":{"kind":"article","key":"2","index":2,"articles":62,"annexes":2},"prev":{"path":"/emir/level-2/rts/153-2013-requirements-for-central-counterparties/articles/1","key":"1","title":"Article 1 — Definitions"},"next":{"path":"/emir/level-2/rts/153-2013-requirements-for-central-counterparties/articles/3","key":"3","title":"Article 3 — Governance arrangements"},"act_anchor":"#art-2"}},"provenance":{"official_url":"https://eur-lex.europa.eu/legal-content/EN/TXT/?uri=CELEX:02013R0153-20240307","check":{"result":"matched","checked_at":"2026-11-09","against":"EUR-Lex"},"repo_path":null,"unit_text_sha256":"ce00533db8844ca2823dce3a30d3c868340595b22b51cb1cd5a60646ff142d2d","note":"the unit is a byte-exact part of the act page, whose check record covers it"},"unit":{"locator":"spaces/emir/level-2/rts/153-2013-requirements-for-central-counterparties/art-2","kind":"article","key":"2","heading":"Article 2 — Information to be provided to ESMA for the recognition of a CCP","text":"## <a id=\"art-2\"></a>Article 2 — Information to be provided to ESMA for the recognition of a CCP\n\nAn application for recognition submitted by a CCP established in a third country shall contain at least the following information:\n\n<a id=\"art-2-p-a\"></a>**(a)** full name of the legal entity;\n\n<a id=\"art-2-p-b\"></a>**(b)** identities of the shareholders or members with qualifying holdings;\n\n<a id=\"art-2-p-c\"></a>**(c)** a list of the Member States in which it intends to provide services;\n\n<a id=\"art-2-p-d\"></a>**(d)** classes of financial instruments cleared;\n\n<a id=\"art-2-p-e\"></a>**(e)** details to be included in the ESMA website in accordance with [Article 88(1)](../../articles/88.md)(e) of Regulation (EU) No 648/2012;\n\n<a id=\"art-2-p-f\"></a>**(f)** details of its financial resources, the form and methods in which they are maintained and the arrangements to secure them including default management procedures;\n\n<a id=\"art-2-p-g\"></a>**(g)** details on the margin methodology and for the calculation of the default fund;\n\n<a id=\"art-2-p-h\"></a>**(h)** a list of the eligible collateral;\n\n<a id=\"art-2-p-i\"></a>**(i)** a breakdown of values, in prospective form if needed, cleared by the applying CCP by each Union currency cleared;\n\n<a id=\"art-2-p-j\"></a>**(j)** results of the stress tests and back tests performed during the year preceding the date of application;\n\n<a id=\"art-2-p-k\"></a>**(k)** its rules and internal procedures with evidences of full compliance with the requirements applicable in that third country;\n\n<a id=\"art-2-p-l\"></a>**(l)** details of any outsourcing arrangements;\n\n<a id=\"art-2-p-m\"></a>**(m)** details on segregation arrangements and respective legal soundness and enforceability;\n\n<a id=\"art-2-p-n\"></a>**(n)** details on the CCP’s access requirements and terms for suspension and termination of membership;\n\n<a id=\"art-2-p-o\"></a>**(o)** details of any interoperability arrangement, including the information provided to the third country competent authority for the purpose of assessing the arrangement.\n\n**CHAPTER III — ORGANISATIONAL REQUIREMENTS ([Article 26](../../articles/26.md) of Regulation (EU) No 648/2012)**\n\n","marks":[],"text_hash":"ce00533db8844ca2823dce3a30d3c868340595b22b51cb1cd5a60646ff142d2d","revision":1}}